PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing rebar mats at Elev. 4 (4th Floor) Facing South (800x600).jpg Installing rebar mats at Stair -2 (4th Floor) Facing South (800x600).jpg Backfilling and compacting at Room 105 (Servery) Facing East (800x600).jpg Continued installing the underground Tele-Data piping at Rahway Ave. Facing the Administration Building (800x600).jpg Excavating at Rahway Ave. in front of the Court building  (800x600).jpg Installing the underground Tele-Data piping at Rahway Ave. Facing the new Court Building (800x600).jpg Paved manhole at Rahway Ave. Facing the new Court Building (800x600).jpg Paved Rahway Ave. under the bridge Facing the new Court Building (800x600).jpg Backfilled and compacted at Room 105 (Servery) Facing North (800x600).jpg
Previous pageNext page Excavating at Rahway Ave. in front of the Court building  (800x600)
Excavating at Rahway Ave. in front of the Court building (800x600)